In July 2023 Fuse Tech took furnace Audit and detected the broken tuckstones at the Doghouse
Fuse Tech was contracted for the repair of the T/C block and started in July 2024
After installation of Refractory Dowels and Plates
After Hot-Face-Welding
After cool down of the Furnace in December 2025
After cool down of the furnace in December 2025
Talk to our experts today and discover how Fuse Tech can help you run longer, cleaner and safer.