In December 2022 FuseTech took Furnace Audit and detected a defective T/C Block.
Dec. 2025
Fuse Tech was contracted for the repair of the T/C block and started in September 2023.
Situation after installation of new T/C Block in September 2023.
Situation after hot face welding of the T/C Block September 2023
Situation after sealing from outside in September 2023
The ceramic welding material can still be seen after 2 years
Talk to our experts today and discover how Fuse Tech can help you run longer, cleaner and safer.