Fuse Tech was called by customer end of March 2017 because side wall starts falling in.
Fuse Tech team started the works with exchange of the collapsed wall
After 3 days the collapsed side wall was exchanged.
After hotface-welding 2017
After this picture the furnace was stopped end of April 2019.